Sumukham

Old No.13, New No.2, Srinivasa Avenue Road
R.A. Puram
Chennai
No items found.

Property Highlights

No items found.

Amenities

Elevators
Power Backup
Rainwater Harvesting
grand granite lobby

Floor Plans

No items found.
No items found.

Availability

S.NO DESCRIPTION SALEABLE AREA
(Sq.Ft)
AVAILABILITY FACING BHK
1 FIRST FLOOR
FLAT -1A 2470 SOLD OUT EAST 4BHK
2 SECOND FLOOR
FLAT -2A 1256 SOLD OUT EAST 2.5BHK
FLAT -2B 1212 SOLD OUT EAST 2.5BHK
3 THIRD FLOOR
FLAT -3A 1256 SOLD OUT EAST 2.5BHK
FLAT -3B 1212 SOLD OUT EAST 2.5BHK
4 FOURTH FLOOR
FLAT -4A 1256 SOLD OUT EAST 2.5BHK
FLAT -4B 1212 SOLD OUT EAST 2.5BHK
5 FIFTH FLOOR
FLAT -5A 2470 AVAILABLE EAST 4BHK

Construction Details

RCC Framed Structure

10  feet 2 inches Ceiling height

Walls will be covered with ceramic tiles up to 7 feet height in the toilets and up to 4 feet height in wash area.

Flooring will be of Vitrified Tiles 3’ x 3’ for living & dining and 2’ x 2’ for other areas.

Pre-fabricated Fenesta Windows

Split Air-conditioners provision in all bedrooms

G20 Black granite slab for the Kitchen Cooking Platform

All closets and wash basins of white colour (Parryware)

Hot and Cold Mixers for shower and tap in each toilet

Provision for Geyser point in each toilet

Bathroom fittings- Jaguar continentals

Concealed Copper wiring of Anchor make

MK Switches

Power Genset Back up for lifts, pumps, common area lighting, all light & fan points in the flat

Auto door lift of Kone make

Government Approvals

 Sumukham ( Srinivasa Avenue)

·    Planning permit No : B / NHRB / 70 / 2020, dated: 19/02/2020.

·    Building permit No : CEBA/WDCN13/00113/2020 , dated: 26/02/2020.

·    CC.No.  : C.C.No.EC/South-1/181  /2021  dated 15/07/2021.

-         Located adjacent to R.K.Mutt Road, Mandaveli

-         Limited Deluxe Flats (Only 8)

-         1 / 2 Car Parks for each flat

-         Close to Kabaleeshwarar Temple, Ramakrishna Mutt, HarishriVidyashram, ChettinadVidayshram, PS Higher Secondary School

-         Grand Granite Lobby, Lift to the terrace & Genset

-         Lush Landscaped Garden

SPECIFICATIONS
2.5, 4 BHK
1212-2470 Sq Ft
Price On Request
Request Viewing

Project Update

·      Flats inner final coat painting work is in progress. (Flat 2A,3A, 4A & 4B completed, flat 1A)

·      Flat wood work is completed (Flat 2A, 3A & 4A, 4B)

·      External final coat painting work is completed.

·      RMUTransformer work is in progress.

·      ProjectCompletion Certificate obtained.

·      Metro water and drainage connection obtained

No items found.

·         Flats inner final coat painting work is in progress. (Flat 2A,3A, 4A& 4B  completed, flat 1A)

·         Flat wood work is in progress (Flat 2B)

·         Flat wood work is completed (Flat 2A, 3A & 4A, 4B)

·         External final coat painting work is completed.

·         RMU Transformer work is completed.

·         Project Completion Certificate obtained.

·         Metro water and drainage connection obtained.

·        E.B connection obtained.

No items found.

·        Flats inner final coat painting work is in progress. (Flat 2A,3A, 4A& 4B  completed, flat 1A)

·        Flat wood work is completed (Flat 2A, 3A & 4A, 4B)

·        External final coat painting work is completed.

·        RMU Transformer work is in progress.

·        Project Completion Certificate obtained.

·        Metro water and drainage connection obtained.

No items found.

·      Flats inner final coat painting work is in progress. (Flat 2A,3A, 4A& 4B  completed, flat 1A)

·      Flat wood work is completed (Flat 2A, 3A & 4A, 4B)

·      External final coat painting work is completed.

·      RMU Transformer work is in progress.

·      Project Completion Certificate obtained.

·      Metro water and drainage connection obtained