Saras

Door No.39, 4th Main Road, Gandhi Nagar,
Adyar
Chennai
No items found.

Property Highlights

Grand granite lobby
Lift to the terrace
Lush Landscaped Garden
Genset

Amenities

Elevators
Power Backup
Rainwater Harvesting

Floor Plans

No items found.
No items found.

Availability

S.NO DESCRIPTION CARPET AREA Sq.ft SALEABLE AREA Sq.ft AVAILABILITY FACING BHK
1 FIRST FLOOR
FLAT -1A 1482 1953 SOLD OUT SOUTH 3BHK
FLAT -1B 910 1210 SOLD OUT NORTH 2.5BHK
2 SECOND FLOOR
FLAT -2A 1314 1743 SOLD OUT SOUTH 3BHK
FLAT -2B 1079 1420 SOLD OUT NORTH 2.5BHK
3 THIRD FLOOR
FLAT -3A 1314 1743 SOLD OUT SOUTH 3BHK
FLAT -3B 1079 1420 SOLD OUT NORTH 2.5BHK
4 FOURTH FLOOR
FLAT -4A 1482 1952 SOLD OUT SOUTH 3BHK
FLAT -4B 900 1211 RESERVED NORTH 2BHK
5 FIFTH FLOOR
FLAT -5A 1338 1773 SOLD OUT SOUTH 3BHK
FLAT -5B 1055 1390 SOLD OUT NORTH 2.5BHK

Construction Details

RCC Framed Structure

10’ 6”  feet Ceiling height

Walls will be covered with ceramic tiles up to 7 feet height in the toilets and up to 4 feet height in the wash area.

Flooring will be of 800 mm x 800 mm vitrified tiles for living, dining & bedrooms.

Pre-fabricated Fenesta Windows

Split Air-conditioners provision in all bedrooms

G20 Black granite slab for the Kitchen Cooking Platform

All closets and wash basins of white colour.

Hot and Cold Mixers for shower and tap in each toilet

Provision for Geyser point in each toilet

Bathroom fittings- Jaguar continentals

Concealed Copper wiring of ISI certified brand

ISI certified brand Switches

Power Genset Back up for lifts, pumps, common area lighting, all light & fan points in the flat

Auto door lift of Kone make

Government Approvals

   SARAS(Gandhi Nagar – 4th Main Road)

·    Planning permit No : B / NHRB / 172 / 2019,dated : 31.07.2019.

·    Building permit No : CEBA/WDCNI3/00200/20I9, dated : 14-08-2019.

·    CC.No.                     :C.C.No.EC/South-1/107/2021 , dated 21-04-2021.

·    TNRERA No.           : TN /29/ Building /0201/ 2019, dated: 13.11.2019

 

-         Located on 4th Main Road, Gandhi Nagar, Adyar

-         Limited Deluxe Flats (Only 10)

-         2 Car Parks for each flat

-         Close to Anantha Padmanabha Swamy Temple, Bala Vidya Mandir, Sisya School, St. Michaels School, St Patricks School, Sankara School, Gandhi Nagar Club, Fortis Malar Hospital & Adyar Cancer Institute.

-         Grand Granite Lobby, Lift to the terrace & Genset

-         Lush Landscaped Garden

SPECIFICATIONS
2, 3BHK
1210-1953 Sq Ft
Price On Request
Request Viewing

Project Update

·        All floor inner 2nd coat paint work is in progress.

·        Flat wood work is in progress. (Flat 4A & 5A)

·        Flat wood work is completed. (Flat 1B )

·        Flat handover is in progress. (Flat – 1B handed over)

·        Terrace pergola work is in progress.

·        Project C.C obtained.

·       All service connection obtained.

 

No items found.

·        All floor inner 2nd coat paint work is in progress.

·        Flat wood work is in progress. (Flat 4A & 5A)

·        Flat wood work is completed. (Flat 1B )

·        Flats handover is in progress. (Flat – 1B handed over)

·        Terrace pergola work is in progress.

·        ProjectC.C obtained.

·       All service connection obtained.

 

No items found.

·         All floor inner 2nd coat paint work is in progress.

·         Flat wood work is in progress. (Flat 4A & 5A)

·         Flat wood work is completed. (Flat 1B )

·         Flats handover is in progress. (Flat – 1B handed over)

·         Terrace pergola work is in progress.

·         Project C.C obtained.

·        All service connection obtained.

 

No items found.

·      All floor inner 2nd coat paint work is in progress.

·      Flat wood work is in progress. (Flat 4A & 5A)

·      Flat wood work is completed. (Flat 1B )

·      Flats handover is in progress. (Flat – 1B handed over)

·     Terrace pergola work is in progress.

·      ProjectC.C obtained.

·      All service connection obtained