Please share your following info.

Please fill out the form below. Once this gets submitted, we will schedule your visit.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Please share your following info.

Please fill out the form below. Once this gets submitted, we will schedule your visit.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Lotus

No.152 A to F, Block No.M-9, L.B.Road
Thiruvanmiyur
Chennai
No items found.

Property Highlights

No items found.

Amenities

Elevators
Power Backup
Rainwater Harvesting
grand granite lobby

Floor Plans

No items found.
No items found.

Availability

S.NO Floor SALEABLE AREA
(Sq.Ft)
AVAILABILITY FACING BHK
1 FIRST FLOOR
FLAT -1A 1750 SOLD OUT NORTH 3BHK
FLAT -1B 1750 SOLD OUT SOUTH 3BHK
FLAT -1C 1750 SOLD OUT SOUTH 3BHK
2 SECOND FLOOR
FLAT -2A 1750 SOLD OUT NORTH 3BHK
FLAT -2B 1750 SOLD OUT SOUTH 3BHK
FLAT -2C 1750 SOLD OUT EAST 3BHK
3 THIRD FLOOR
FLAT -3A 1750 SOLD OUT NORTH 3BHK
FLAT -3B 1750 SOLD OUT SOUTH 3BHK
FLAT -3C 1750 SOLD OUT EAST 3BHK
4 FOURTH FLOOR
FLAT -4A 1750 SOLD OUT NORTH 3BHK
FLAT -4B 1750 SOLD OUT SOUTH 3BHK
SUIT 448 SOLD OUT EAST SUIT

Construction Details

RCC Framed Structure

11 feet Ceiling height

Walls will be covered with ceramic tiles up to 7 feet height in the toilets and up to 4 feet height in the wash area.

Flooring will be of Vitrified Tiles 2’ x 2’

Pre-fabricated Fenesta Windows

Split Air-conditioners provision in all bedrooms

G20 Black granite slab for the Kitchen Cooking Platform

All closets and wash basins of white colour (Parryware)

Hot and Cold Mixers for shower and tap in each toilet

Provision for Geyser point in each toilet

Bathroom fittings- Jaguar continentals

Concealed Copper wiring of Anchor make

MK Switches

Power Genset Back up for lifts, pumps, common area lighting, all light & fan points in the flat

Auto door lift of Kone make

Government Approvals

Planning permit No : B / Spl.Bldg / 29/ A & B / 2019, dated – 05-03-2019

Building  permit No : CEBA / WDCN13 / 00142 / 2019, dated – 04-07-2019.

TNRERA No                    :TN/29/Building/0008/2020 dated 08.01.2020

CC.No.                        : C.C.No.EC / South-I /108 / 2020, dated – 16-07-2020.

-         Located on LB Road, Thiruvanmiyur, Opp to Post Office

-         Limited Deluxe Flats (Only 12)

-         2 Car Parks for each flat

-         Close to TIDEL Park, Ascendas, Holiday Inn & Apollo Proton, Thiruvanmiyur MRTS, Proposed DLF IT Park

-         Grand Granite Lobby, Lift to the terrace & Genset

-         Lush Landscaped Garden

SPECIFICATIONS
1, 3 BHKs
448 - 1750
Price On Request
Request Viewing

Project Update

·         Flats final coat painting work is completed (10/12 flats).

·         Flat wood work is Completed (10/12 flats).

·         Flat handed over is in progress. (10/12 flats handover)

·         ProjectC.C obtained.

·       All service connection is obtained

No items found.

·         Flats final coat painting work is completed (10/12 flats).

·         Flat wood work is Completed (10/12 flats).

·         Flat handed over is in progress. (10/12 flats handover)

·         ProjectC.C obtained.

·       All service connection is obtained

No items found.

·         Flats final coat painting work is completed (10/12 flats).

·         Flat wood work is Completed (10/12 flats).

·         Flat handed over is in progress. (10/12 flats handover)

·         ProjectC.C obtained.

·       All service connection is obtained

No items found.

·         Flats final coat painting work is completed (10/12 flats).

·         Flat wood work is Completed (10/12 flats).

·         Flat handed over is in progress. (10/12 flats handover)

·         ProjectC.C obtained.

·       All service connection is obtained

No items found.
shower of love

Hear what our families say about us.