Lakshmi

Adyar

Download Brochure

Download file

Enquire Now

Amenities

Generator Backup
CCTV
Rain Water Harvesting
Intercom

Master Layout Plan

Availability

Flat No. Floor Type Area Facing Layout Availability
5A 5 4BHK + 3T 2216 North Sold Out
3A 3 4BHK + 3T 2216 North Sold Out
4A 4 4BHK + 3T 2216 North Sold Out

Approvals

Planning Permit No:

OL-PP/NHRB/0343/2024 OL-00987

Date of Permit:

2024-06-19

Building Permission No:

CEBA/WDCN13/00294/2024

Date of Permit:

2024-07-01

Project Update Images

  • External plastering work is completed.
  • Inner plastering work is in progress. ( Upto 4th floor completed)
  • Toilet plumbing work is in progress.(upto 4th floor completed)
  • All floor windows granitejambs work is in progress. (70% completed)
  • Elevation work is in progress.(Band work progress,south side completed)
  • External plastering work is completed.
  • All floor inner plastering work iscompleted.
  • 5th Floor toilet plumbing work is in progress.(upto 4th floor completed)
  • All floor windows granitejambs work is in progress. (85% completed)
  • Elevation work is in progress.(Band work progress (90% completed)
  • Elevation wall cladding tiles work is in progress.
  • 2nd floor toilet wall tiles work is completed.(1st floor progress)
  • 5th Floor toilet plumbing work is in progress.(upto 4th floor completed)
  • All floor windows granite jambs work is in progress. (80% completed)
  • Elevation work is in progress.(Band work progress,90% completed)
  • Elevation wall cladding tiles work is in progress.
  • 2nd floor toilet wall tiles work is completed.(1st floor progress)
  • Texture painting work is in progress.(75% completed)
  • All floor toilet plumbing work is Completed.
  • 2nd floor general flooring work is in progress.
  • All floor windows granite jambs work is in progress. (80% completed)
  • Elevation work is in progress.(Band work progress,90% completed)
  • Elevation wall cladding tiles work is in progress.(25% completed)
  • Toilet wall tiles work is in progress.(1st and 2nd floor completed)
  • Texture painting work is in progress.(90% completed)
  • Terrace weathering course work is in progress.